During a lifeboat drill at sea in good weather conditions, the starboard lifeboat was lowered to the embarkation deck. In this operation the top link of the forward chain for the connection between the davit floating block and the hook on the lifeboat parted, such that the entire load from the lifeboat was transferred to the aft hook/chain. As the […]
